OGIO Framework Polo OG125
Framework Polo
With tonal bartacks and seaming details, this sophisticated, high-performance polo breaks the routine frame of mind.
- 4.2-ounce, 100% poly pique with stay-cool wicking and odor control technologies
- OGIO heat transfer label for tag-free comfort
- Self-fabric collar
- 3-button placket with dyed-to-match buttons and tonal bartacks
- Set-in, open hem sleeves
- Woven OGIO badge on left sleeve
Price
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Shipping
More Images
Size Guide
XS | S | M | L | XL | 2XL | 3XL | 4XL | |
---|---|---|---|---|---|---|---|---|
Chest | 32-34 | 35-37 | 38-40 | 41-43 | 44-46 | 47-49 | 50-53 | 54-57 |
Shipping
This item is typically produced within 5 to 7 business days.
Production time is dependent on total order size and time of the year; average production time increases to 7 to 10 business days during the months of November and December.
Transit time is additional and depends on the destination, typically within 5 business days.
The UPS Ground Time-in-Transit Map below provides a full color U.S. map illustrating the typical number of transit days, based on the ship date, for delivery via UPS Ground services. (Last Updated March 2024)
Have a must have in-hands deadline? Reach out to us at Hello@OurWearhouse.com to discuss rush production and/or shipping options and feasability.